Recent Changes
Recent Changes · Search:

Other FIT Wellington pages:

FITWellington.​HarbourQuaysTalkingPoints History

Hide minor edits - Show changes to markup

09 August 2026 at 12:48 PM by John Rankin - add margin notes
Added line 13:

Tick for concept

Added line 25:

Tick for logic

Added line 39:

Question mark for physics

09 August 2026 at 12:39 PM by John Rankin - change introduction
Changed line 1 from:

FIT will present our view on the Harbour Quays bus priority project. We will assess the concept (why), logic (what), and physics (how) of the proposal. Our conclusion is the proposal is good and can be better.

to:

I am speaking on behalf of FIT Wellington. I will assess the concept (why), logic (what), and physics (how) of the Harbour Quays bus priority proposal. Our conclusion is the proposal is good and can be better.

08 August 2026 at 06:30 PM by John Rankin - number conclusion
Changed lines 44-46 from:
  • endorse the concept and logic of the Harbour Quays project
  • evaluate the proposed design against a contraflow option, before making a decision on the project’s physics
to:
  1. endorse the concept and logic of the Harbour Quays project; and
  2. evaluate the proposed design against a contraflow option, before making a decision on the project’s physics
08 August 2026 at 06:28 PM by John Rankin - copyfit to 2 pages
Changed line 44 from:
  • endorse the concept and logic of the Harbour Quays bus priority project
to:
  • endorse the concept and logic of the Harbour Quays project
08 August 2026 at 06:27 PM by John Rankin - make the conclusion an itemised list
Changed lines 42-44 from:

FIT endorses the concept and logic of the Harbour Quays bus priority project.

We invite the Councils to evaluate the proposed design against a contraflow option, before making a decision on the project’s physics.

to:

FIT invites the Councils to:

  • endorse the concept and logic of the Harbour Quays bus priority project
  • evaluate the proposed design against a contraflow option, before making a decision on the project’s physics
07 August 2026 at 09:26 PM by John Rankin - farther or further?
Changed lines 1-2 from:

FIT will present our view on the Harbour Quays bus priority project. We will outline the concept (why), logic (what), and physics (how) of the proposal. Our conclusion is the proposal is good and can be better.

to:

FIT will present our view on the Harbour Quays bus priority project. We will assess the concept (why), logic (what), and physics (how) of the proposal. Our conclusion is the proposal is good and can be better.

Changed lines 20-21 from:

Standard practice on busy, high-demand corridors is to provide dedicated, widely spaced stops for express services. Experience shows that people will walk further for a faster service.

to:

Standard practice on busy, high-demand corridors is to provide dedicated, widely spaced stops for express services. Experience shows that people will walk farther for a faster service.

Changed line 29 from:

If you ask people to walk further for a faster service, the quality of the pedestrian experience is paramount, yet the current proposal is hostile to pedestrians.

to:

If you ask people to walk farther for a faster service, the quality of the pedestrian experience is paramount, yet the current proposal is hostile to pedestrians.

07 August 2026 at 01:24 PM by John Rankin - remove Wellington / LA comparison
Deleted lines 6-7:

Wellington has more cars per capita than Los Angeles.

Changed lines 44-45 from:

We invite the Councils to evaluate the current design against a contraflow option, before making a decision on the project’s physics.

to:

We invite the Councils to evaluate the proposed design against a contraflow option, before making a decision on the project’s physics.

07 August 2026 at 10:54 AM by John Rankin - change perspective back to view
Changed line 1 from:

FIT will present our perspective on the Harbour Quays bus priority project. We will outline the concept (why), logic (what), and physics (how) of the proposal. Our conclusion is the proposal is good and can be better.

to:

FIT will present our view on the Harbour Quays bus priority project. We will outline the concept (why), logic (what), and physics (how) of the proposal. Our conclusion is the proposal is good and can be better.

07 August 2026 at 10:53 AM by John Rankin - and not but
Changed lines 1-3 from:

FIT will present our view on the Harbour Quays bus priority project. We will outline the concept (why), logic (what), and physics (how) of the proposal. Our conclusion is the proposal is good, but can be better.

(:typeset-page fontset=kepler colophon=off parasep=space subtitle="Good but Can be Better" headingcolor=RoyalBlue colorlinks=on marginshift=on fontsize=12pt :)

to:

FIT will present our perspective on the Harbour Quays bus priority project. We will outline the concept (why), logic (what), and physics (how) of the proposal. Our conclusion is the proposal is good and can be better.

(:typeset-page fontset=kepler colophon=off parasep=space subtitle="Good and Can be Better" headingcolor=RoyalBlue colorlinks=on marginshift=on fontsize=12pt :)

07 August 2026 at 10:45 AM by John Rankin - 2-lane
Changed line 24 from:

A corridor with express and local services needs 4 lanes, so express services can overtake local services at stops, but the Golden Mile has a 2 lane bottleneck from the south end of Lambton Quay to the north end of Courtenay Place.

to:

A corridor with express and local services needs 4 lanes, so express services can overtake local services at stops, but the Golden Mile has a 2-lane bottleneck from the south end of Lambton Quay to the north end of Courtenay Place.

07 August 2026 at 10:39 AM by John Rankin - minor tweaks
Changed lines 1-2 from:

FIT will present our view on the Harbour Quays bus priority project. We will outline the concept (why), the logic (what), and the physics (how) of the proposal. Our conclusion is the proposal is good, but can be better.

to:

FIT will present our view on the Harbour Quays bus priority project. We will outline the concept (why), logic (what), and physics (how) of the proposal. Our conclusion is the proposal is good, but can be better.

Added lines 7-8:

Wellington has more cars per capita than Los Angeles.

Changed line 33 from:

Having to cross a 6-lane road is bad; pushing a button to do so adds insult to injury. The project needs to remove beg buttons between the Golden Mile and Harbour Quays.

to:

Having to cross a 6-lane road is bad; pushing a button to do so adds insult to injury. The project needs to remove all the beg buttons between the Golden Mile and Harbour Quays.

07 August 2026 at 10:31 AM by John Rankin - add typeset command
Changed lines 1-2 from:

FIT will present our perspective on the Harbour Quays bus priority project. We will outline our view of the concept (why), the logic (what), and the physics (how) of the proposal. Our verdict is that the proposal is good, but can be better.

to:

FIT will present our view on the Harbour Quays bus priority project. We will outline the concept (why), the logic (what), and the physics (how) of the proposal. Our conclusion is the proposal is good, but can be better.

(:typeset-page fontset=kepler colophon=off parasep=space subtitle="Good but Can be Better" headingcolor=RoyalBlue colorlinks=on marginshift=on fontsize=12pt :)

Changed lines 18-19 from:

Current services are slow and unreliable. The Golden Mile has too many buses, with multiple bottlenecks, meaning all services travel at the speed of the slowest bus.

to:

Current services through the city centre are slow and unreliable. The Golden Mile has too many buses, with multiple bottlenecks, meaning all services travel at the speed of the slowest bus.

Changed line 40 from:

Conclusions

to:

Conclusion

06 August 2026 at 06:09 PM by John Rankin - shorten title
Changed line 25 from:

Physics: how will Harbour Quays bus priority work?

to:

Physics: how will bus priority work?

06 August 2026 at 06:06 PM by John Rankin - complete rough first draft
Added lines 1-43:

FIT will present our perspective on the Harbour Quays bus priority project. We will outline our view of the concept (why), the logic (what), and the physics (how) of the proposal. Our verdict is that the proposal is good, but can be better.

Concept: why Harbour Quays bus priority?

The Infrastructure Commission advises shifting less-urgent trips to off-peak times and encouraging public transport use, to free up road space for those who need it most.

The government’s direction is to increase the proportion of public transport operating costs funded from private sources, such as passenger fares and advertising revenue.

Greater Wellington’s strategy is to lift public transport’s share of the region’s mobility market, by increasing service frequency, reliability, and speed, making public transport more useful to more people for more journeys.

We expect the bus fleet will be more productive, carrying more people using the same number of buses.

Logic: what is Harbour Quays bus priority?

Current services are slow and unreliable. The Golden Mile has too many buses, with multiple bottlenecks, meaning all services travel at the speed of the slowest bus.

Standard practice on busy, high-demand corridors is to provide dedicated, widely spaced stops for express services. Experience shows that people will walk further for a faster service.

A corridor with express and local services needs 4 lanes, so express services can overtake local services at stops, but the Golden Mile has a 2 lane bottleneck from the south end of Lambton Quay to the north end of Courtenay Place.

The solution is a second 2-lane spine on the Harbour Quays for express services, which will also make local services on the Golden Mile faster and more reliable.

Physics: how will Harbour Quays bus priority work?

If you ask people to walk further for a faster service, the quality of the pedestrian experience is paramount, yet the current proposal is hostile to pedestrians.

Having to cross a 6-lane road is bad; pushing a button to do so adds insult to injury. The project needs to remove beg buttons between the Golden Mile and Harbour Quays.

People visiting Unity Books may prefer to catch a local service outside the door, rather than walk to the Quays. The design makes it impractical to transfer between local and express services at the southern end of Courtenay Place.

A more pedestrian-friendly design would use all-day contraflow bus lanes, on the middle 2 of the 6 traffic lanes. The southbound bus lane would continue on Wakefield Street, the northbound bus lane on Cable Street, on the Tākina side of these streets.

If contraflow bus lanes continue on Cambridge and Kent Terraces to the Basin Reserve, bus stops at the junction with Courtenay Place would let passengers transfer between express Harbour Quays and local Golden Mile services.

Conclusions

FIT endorses the concept and logic of the Harbour Quays bus priority project.

We invite the Councils to evaluate the current design against a contraflow option, before making a decision on the project’s physics.

Page last modified 09 August 2026 at 12:48 PM