FITWellington.​LGWMPersonalSubmission History

Hide minor edits - Show changes to output

28 November 2021 at 05:40 PM by John Rankin - last changes
Changed lines 19-21 from:
The proposals deliver on 4 out of these 5 characteristics, but none of the options provides dedicated lanes with full signal priority south of Newtown. This is likely to make the service slower and less reliable -- streetcar rather than metro. I encourage LGWM to investigate ways to bring the design closer to the original mass rapid transit vision, or explain why it is unable to do so. Silently moving the goal posts is not good enough and suggests weak governance.

All options will generate greenhouse gas emissions during, and arising from, construction. The cost of offsetting these embedded emissions, such as by restoring some of the region's degraded wetlands, needs to be accounted for in the business case for this and other large infrastructure projects. Carbon offsets are part of the capital project cost. Best environmental practice for on-street light rail is to minimise embedded emissions by use of ''lawn tracking''. Lawn tracks incorporate grasses and groundcover plants over infilled soil. LGWM has a duty of care to include a light rail option that embodies these principles.
to:
LGWM's proposals deliver on 4 out of these 5 characteristics, but none of the options provides dedicated lanes with full signal priority south of Newtown. This is likely to make the service slower and less reliable -- streetcar rather than metro. I encourage LGWM to investigate ways to bring the design closer to the original mass rapid transit vision, or explain why it is unable to do so. Silently moving the goal posts is not good enough and suggests weak governance.

All options will generate greenhouse gas emissions during, and arising from, construction. The cost of offsetting these embedded emissions, such as by restoring some of the region's degraded wetlands, needs to be accounted for in the business case for this and other large infrastructure projects. Carbon offsets are part of the capital project cost. Best environmental practice for on-street light rail is to minimise embedded emissions by use of ''lawn tracking''. Instead of a concrete light rail surface, lawn tracks incorporate grasses and groundcover plants over infilled soil. LGWM has a duty of care to include a light rail option that embodies these principles.
28 November 2021 at 12:38 PM by John Rankin - add lawn tracking
Added lines 21-22:
All options will generate greenhouse gas emissions during, and arising from, construction. The cost of offsetting these embedded emissions, such as by restoring some of the region's degraded wetlands, needs to be accounted for in the business case for this and other large infrastructure projects. Carbon offsets are part of the capital project cost. Best environmental practice for on-street light rail is to minimise embedded emissions by use of ''lawn tracking''. Lawn tracks incorporate grasses and groundcover plants over infilled soil. LGWM has a duty of care to include a light rail option that embodies these principles.
Changed line 30 from:
All options will generate greenhouse gas emissions during, and arising from, construction. The cost of offsetting these embedded emissions, such as by restoring some of the region's degraded wetlands, needs to be accounted for in the business case for this and other large infrastructure projects. Carbon offsets are part of the capital project cost. In a similar way, relocating eastbound through traffic from Vivian Street to Karo Drive would allow conversion of Vivian Street between Cuba Street and Taranaki Street into a linear park.
to:
27 November 2021 at 02:49 PM by John Rankin - finalise the story
Changed lines 1-2 from:
I support the submission from FIT Wellington. In my view, Option 4 is the best option (south coast light rail via Taranaki Street), subject to further improvements.
to:
I support the submission from FIT Wellington. In my view, Option 4 is the best option (south coast light rail via Taranaki Street), including the improvements FIT has proposed.
Changed line 28 from:
All options will generate greenhouse gas emissions during, and arising from, construction. The cost of offsetting these emissions, such as by restoring some of the region's degraded wetlands, needs to be accounted for in the business case for this and other large infrastructure projects. Carbon offsets are part of the capital project cost.
to:
All options will generate greenhouse gas emissions during, and arising from, construction. The cost of offsetting these embedded emissions, such as by restoring some of the region's degraded wetlands, needs to be accounted for in the business case for this and other large infrastructure projects. Carbon offsets are part of the capital project cost. In a similar way, relocating eastbound through traffic from Vivian Street to Karo Drive would allow conversion of Vivian Street between Cuba Street and Taranaki Street into a linear park.
26 November 2021 at 02:17 PM by John Rankin - fix surtitle
Changed line 3 from:
(:typeset-page fontset=kepler colophon=off headingcolor=RoyalBlue surtitle="Options Feedback" subtitle="Option 4 is best value at least risk" parasep=space :)
to:
(:typeset-page fontset=kepler colophon=off headingcolor=RoyalBlue surtitle="MRT Options Feedback" subtitle="Option 4 is best value at least risk" parasep=space :)
26 November 2021 at 02:15 PM by John Rankin - tidy typography
Changed lines 1-2 from:
I support the submission from FIT Wellington.
to:
I support the submission from FIT Wellington. In my view, Option 4 is the best option (south coast light rail via Taranaki Street), subject to further improvements.
Changed lines 5-10 from:
In my view, Option 4 is the best option (south coast light rail via Taranaki Street), subject to further improvements.

Option 4 has the lowest delivery risk. Deliverability must be
a foremost consideration in choosing a preferred option. Evidence from past large government infrastructure projects shows that two factors play a critical role in determining success: replicable modularity in design and speed in iteration. Option 4 best meets these criteria. Design patterns from the N-S line can be reused on the E-W (Miramar to Karori) corridor.

Some people have criticised Option 4 for bypassing the demand from Mt Victoria. This is a strength, not a weakness. Bus priority to the eastern suburbs will ensure Mt Victoria continues to enjoy good bus service
. A future E-W rapid transit corridor is likely to follow Cambridge Terrace between Wakefield Street and the Basin Reserve. This will enhance the service to meet growing Mt Victoria demand, which in turn will strengthen the case for E-W mass rapid transit.
to:

Option 4 has the lowest delivery risk. Deliverability must be a foremost consideration in choosing a preferred option. Evidence from past large government infrastructure projects shows that two factors play
a critical role in determining success: replicable modularity in design and speed in iteration. Option 4 best meets these criteria. Design patterns from the N`-S line can be reused on the E`-W (Miramar to Karori) corridor.

Some people have criticised Option 4 for bypassing
the demand from Mt Victoria. This is a strength, not a weakness. Bus priority to the eastern suburbs will ensure Mt Victoria continues to enjoy good bus service. A future E`-W rapid transit corridor is likely to follow Cambridge Terrace between Wakefield Street and the Basin Reserve. This will enhance the service to meet growing Mt Victoria demand, which in turn will strengthen the case for E`-W mass rapid transit.
Changed line 21 from:
Fig(supplyDemand) illustrates the investment logic for different transit modes. It shows the lower unit operating cost of higher capacity modes overcomes their higher capital cost, provided there is sufficient demand. Hence the success of Option 4 (and all options with streetcars to Island Bay) depends on there being sufficient demand on the N-S corridor to fill the vehicles. The benefit realisation plan must identify ways to:
to:
Fig(supplyDemand) illustrates the investment logic for different transit modes. It shows the lower unit operating cost of higher capacity modes overcomes their higher capital cost, provided there is sufficient demand. Hence the success of Option 4 (and all options with streetcars to Island Bay) depends on there being sufficient demand on the N`-S corridor to fill the vehicles. The benefit realisation plan must identify ways to:
Changed line 26 from:
%center%%width=97pct id=supplyDemand%[[Attach:match-supply-demand.png"investment logic" -> Attach:match-supply-demand.pdf]] |Investment logic
to:
%center%%width=97pct id=supplyDemand%[[Attach:match-supply-demand.png"investment logic" -> Attach:match-supply-demand.pdf]] |Mass Rapid Transit investment logic
26 November 2021 at 02:00 PM by John Rankin - tweak layout
Added lines 3-4:
(:typeset-page fontset=kepler colophon=off headingcolor=RoyalBlue surtitle="Options Feedback" subtitle="Option 4 is best value at least risk" parasep=space :)
Changed lines 7-8 from:
Option 4 has the lowest delivery risk. Deliverability must be the foremost consideration in choosing a preferred option. Evidence from past large government infrastructure projects shows that two factors play a critical role in determining success: replicable modularity in design and speed in iteration. Option 4 best meets these criteria. Design patterns from the N-S line can be reused on the E-W (Miramar to Karori) corridor.
to:
Option 4 has the lowest delivery risk. Deliverability must be a foremost consideration in choosing a preferred option. Evidence from past large government infrastructure projects shows that two factors play a critical role in determining success: replicable modularity in design and speed in iteration. Option 4 best meets these criteria. Design patterns from the N-S line can be reused on the E-W (Miramar to Karori) corridor.
Changed line 13 from:
Previously, LGWM defined Mass Rapid Transit as having the following characteristics:
to:
Previously, LGWM defined mass rapid transit as having the following characteristics:
Changed line 27 from:
%width=100pct id=supplyDemand%[[Attach:match-supply-demand.png"investment logic" -> Attach:match-supply-demand.pdf]] |Investment logic
to:
%center%%width=97pct id=supplyDemand%[[Attach:match-supply-demand.png"investment logic" -> Attach:match-supply-demand.pdf]] |Investment logic
26 November 2021 at 01:48 PM by John Rankin - draft personal submission
Added lines 1-29:
I support the submission from FIT Wellington.

In my view, Option 4 is the best option (south coast light rail via Taranaki Street), subject to further improvements.

Option 4 has the lowest delivery risk. Deliverability must be the foremost consideration in choosing a preferred option. Evidence from past large government infrastructure projects shows that two factors play a critical role in determining success: replicable modularity in design and speed in iteration. Option 4 best meets these criteria. Design patterns from the N-S line can be reused on the E-W (Miramar to Karori) corridor.

Some people have criticised Option 4 for bypassing the demand from Mt Victoria. This is a strength, not a weakness. Bus priority to the eastern suburbs will ensure Mt Victoria continues to enjoy good bus service. A future E-W rapid transit corridor is likely to follow Cambridge Terrace between Wakefield Street and the Basin Reserve. This will enhance the service to meet growing Mt Victoria demand, which in turn will strengthen the case for E-W mass rapid transit.

Whichever option is eventually chosen, the implementation timetable must be radically shortened. By 2050, we need to transform Wellington from a car oriented city to a transit oriented city. To achieve this system redesign, LGWM needs to deliver two mass rapid transit projects per decade, for the next 30 years. Other cities are doing this; so can we.

Previously, LGWM defined Mass Rapid Transit as having the following characteristics:
*  High-frequency services (every 10 minutes or less)
*  Modern, high capacity electric vehicles with superior ride quality
*  Fast loading and unloading
*  Dedicated lanes with signal priority
*  High-quality stations with level boarding

The proposals deliver on 4 out of these 5 characteristics, but none of the options provides dedicated lanes with full signal priority south of Newtown. This is likely to make the service slower and less reliable -- streetcar rather than metro. I encourage LGWM to investigate ways to bring the design closer to the original mass rapid transit vision, or explain why it is unable to do so. Silently moving the goal posts is not good enough and suggests weak governance.

Fig(supplyDemand) illustrates the investment logic for different transit modes. It shows the lower unit operating cost of higher capacity modes overcomes their higher capital cost, provided there is sufficient demand. Hence the success of Option 4 (and all options with streetcars to Island Bay) depends on there being sufficient demand on the N-S corridor to fill the vehicles. The benefit realisation plan must identify ways to:
*  achieve mode-shift from private cars to mass rapid transit;
*  develop medium-density, amenity-rich, transit-oriented communities around the stations; and
*  encourage more MRT rides per person, such as offering unlimited travel for a fixed monthly fee.

%width=100pct id=supplyDemand%[[Attach:match-supply-demand.png"investment logic" -> Attach:match-supply-demand.pdf]] |Investment logic

All options will generate greenhouse gas emissions during, and arising from, construction. The cost of offsetting these emissions, such as by restoring some of the region's degraded wetlands, needs to be accounted for in the business case for this and other large infrastructure projects. Carbon offsets are part of the capital project cost.

X:John Rankin