Recent Changes
Recent Changes · Search:

FITWellington.​ThreeMinuteSummary History

Show minor edits - Show changes to output

08 September 2015 at 01:31 PM by John Rankin - draft pitch
Added lines 1-37:
FIT/Generation Zero Presentation to GW RLTC meeting on item 7 on the agenda (BRT business plan): 10am 2015-09-08 at GW

FIT/Generation Zero Presentation to GW Sustainable Transport Committee meeting on part 3 of item 4 on the agenda (General Managers' Report, Regional Transport Planning, BRT business case update): 9:30am 2015-09-09 at GW

* I represent FIT Wellington--Fair, Intelligent, Transport. Why 'Fair'? Because we believe the spine study unfairly side-lined light rail with inflated costs. Why 'Intelligent'?  Because bulldozing a route through Mt Victoria and the unpopulated town belt is not intelligent:  it will not fulfil the excellent aims of the spine study “to produce a high quality, modern public transport system for the Greater Wellington region”

* We comprise engineers, scientists, policy analysts and climate & health professionals with community walking & cycling advocates.

* We present alongside Generation Zero: their generation will inherit plans made now.

* Jenny Chetwynd post-flyover says "so it's about going back to the community & taking a fresh approach." Here we are, and here's a fresh approach.

* John Milford of the Wellington Employers' Chamber of Commerce says, "We need to get together to sort it out." Ready when you are, John.

* Our solution for the Basin Reserve is simple. Our route will bypass and help decongest it.

* Our research shows that BRT as presently configured for Wellington does not qualify as such according to internationally-agreed BRT criteria--neither will it be rapid nor provide the capacity required .

* Here are route options which are credible, affordable and consistent with LRT best-practice world-wide. You have copies. I won’t go into detail: we did that in a very productive meeting with Greg Campbell and Wayne Hastie on 2015-09-06. The map should be viewed with the explanatory text and costings sent to Greg: we ask that he send it to all members of your committee.

%width 100pct%Attach:light-rail-map.png

* The route options are not the only possible: they are there for discussion.

* We prefer a route along the whole of Lambton Quay if technically possible.

%width 100pct%Attach:inner-city-map.png

* We agree that the currently-planned GW incremental bus improvements should go ahead as a temporary measure...

* But we believe climate change and looming fossil fuel shortages require a paradigm shift.

* We need  high capacity, all-electric public transport. It should be urgently planned for now

* If we start today, Wellington could have a world-class light rail tram service between the Railway Station and the Airport, via the Hospital, by 2030: this for an estimated cost as low as $450  million.

* We are happy to enter discussions with all decision-makers and welcome questions now.
Page last modified 08 September 2015 at 05:35 PM